What are the LERAP requirements for Broadway Star/Palio?

The CRD re-approvals for Broadway Star (MAPP 18273) and Palio (MAPP 18349) removed the requirement for a buffer zone and therefore LERAP requirement for these products. It is however important to check other requirements e.g. Cross Compliance for the Basic Payment Scheme (BPS) requires no application of pesticides to land within 2 metres of the centre of a watercourse or field ditch, or to land from the edge of the watercourse or field ditch to 1 metre on the landward side of the top of the bank of a watercourse or field ditch.